LeClair Construction Management

IMPORTANT NOTICE:

LeClair Construction Management is deeply saddened by the collapse of the Rosseau Lake College Recreation Centre in March. Please click here to read our full statement Click Here

LeClair Construction Management

What We Do

LeClair Construction Management is a full-service Construction and Project Management firm offering professional services to select construction and development projects for over thirty years.

Services Include:

  • Land assessment and change of use.

  • Site Development and servicing.

  • Due diligence and assessment of existing structures.

  • In-house schematic and program design services.

  • Multi-iterative cost consulting, Professional Quantity Surveyor.

  • Consultant team procurement and document review.

  • Construction methodology and scheduling.

  • Tender and contract document preparation and administration.

  • Fully transparent and auditable trade tenders and reporting.

  • Construction site management with quality control and assurance procedures and documentation.

  • Construction cost control with real time budget forecasting and reporting.

  • Project close-out, commissioning, operator training, and handover procedures.

  • Third party claims preparation, representation, and dispute resolution.

  • Third party incident review and consulting.

Featured Work

LeClair Construction Management completed Rosseau Lake College Recreation Centre in snowy landscape

Rosseau Lake College-Recreation Centre

Construction Start: September 2023
Substantial Completion: December 2024

Rosseau Lake College STEAM building by LeClair Construction Management

Rosseau Lake College-STEAM

gallery

Cathedral Hills
Parliament Hill, Ottawa

Wellington West
Parkdale, Ottawa

The Miller
Manotick

Simpson Tower
Toronto

Cactus Club-First Canadian Place
Toronto

Marsh McLennan
Toronto

Cactus Club
Edmonton

Yaletown Keg
Vancouver

Portfolio

  • Rosseau Lake College, Muskoka- Master Service Agreement managing Campus Master Plan and redevelopment.
  • “Orchard View Manotick” for Reichmann International- Construction Manager. 95,000sf, 3 story wood frame construction with one sub-grade parking level, 45-unit seniors’ apartments with full commercial kitchen and public café.
  • “Wellington West”, Ottawa for Reichmann International- Construction Manager. 93,000sf, 9 story concrete construction with two sub-grade parking levels, 111 units, pool, lounge, gym, program areas, commercial kitchen, and podium level terrace.
  • “Cathedral Hill” Ottawa for Reichmann International- Construction/Project Manager. 180,000sf, 18 story concrete construction with three sub-grade parking levels, 160 units, pool, bar, cafe, gym, program areas, 18th floor dining room and commercial kitchen located on Parliament Hill.
  • SAP Canada Head Office, 222 Bay St. Toronto- 60,000sf, three floor office fit-up with new feature stair.
  • Walmart Canadian Store Support Centre, Mississauga- 180,000sf, retrofit and re-stack. Multi-phased, including new washrooms, cafeteria/kitchen retrofit and mechanical upgrades.
  • Desjardins General Insurance Group, Mississauga- 220,000sf, interior fit-up and restack. Multi-phased.
  • Mosaic Sales Solutions, Carpet Factory, Liberty Village, Toronto- 18,000sf, interior fit-up for this media/technology firm. Post and beam historical building.
  • Wildeboer Law, 365 Bay St, Toronto- 18,000sf, three floor fit-up with feature client facing areas.
  • Newell Brands, Brampton- 40,000sf, product showroom and administration office fit-up.
  • Scotiabank ECO 3 and 6, 4 King Street W, Toronto- 80,000sf, 6 floor tenant fit-up with two interconnecting feature stairs.
  • Simpson Tower Re-Clad, 401 Bay St, Toronto- 33 story, building envelope replacement while existing tenants maintained occupancy. Extreme urban site access restrictions. 10,000 engineered staging platform constructed on roof of neighboring Hudson’s Bay Store.
  • US Consulate, Toronto- 12,000sf, physical and electronic security upgrades in a classified high security environment including, sally port, holding cells and FE/BR doors and wall assembly installations.
  • Equinox Fitness, Toronto- 2 and 3rd floor Commerce Court W. 37,000sf luxury fitness facility.
  • TD Treasury Optimization, TD Tower, Toronto- 25,000sf, LEED Platinum tenant fit-up/back to base.
  • Cactus Club Restaurant, Jasper Ave Edmonton Alberta- 9,000sf restaurant.
  • Cactus Club Restaurant, First Canadian Place- 23,000sf flagship three level restaurant, including podium rooftop lounge, glass elevator, feature stair, with extensive structural and mechanical base-building upgrades.
  • Marsh & McLennon- 10 story, 250,000sf tenant fit-up in the new South core tower at 120 Bremner. Restoration of existing spaces.
  • Holt Renfrew, Square One- 160,000sf new ground up retail store.
  • “Simon’s” Square One- 106,000sf new retail store.
  • “Bensimon Byrne”, Toronto- 45,000sf advertising agency interior fit-up, CBC building.
  • “Eataly”, Manulife Centre, Toronto- Precon Project Director. 45,000sf Indoor market/restaurant complex, Manulife Centre.
  • “Loyalty One”, Toronto- Precon Project Director, 6 story, 200,000sf ARIDO award winning tenant fit-up in the new Globe and Mail Building 351 King St. W.
  • 333 Queen St. W, Toronto- 23,000sf, base building construction. Demolition of 4 existing buildings, shoring adjacent buildings/roadways, site servicing, excavation, raft slab, structural steel, core-slab and masonry construction on an extremely tight urban site.
  • H&M Square 1, Mississauga- 14,000s retail store, phased/occupied work.
  • M:BRGR 409 King St. W, Toronto- 6,000sf, restaurant interior fit-up.
  • The Keg Yaletown, Vancouver- 20,000sf, 4 story flagship restaurant, with rooftop patio.
  • H&M Pacific Centre, Vancouver- 33,000sf, West Coast flagship retail store.
  • H&M Louhgeed Mall, Burnaby- 12,000sf, retail store.
  • H&M Conestoga Mall, Waterloo- 14,000sf, retail store.
  • Spence Diamonds Square One, Mississauga- 8,000sf, ground-up retail store.
  • Esprit Metropolis, Burnaby- 5,000sf, retail store.
  • Esprit Fairview Mall, Toronto- 3,000sf, retail store.
  • Coquitlam Centre Mall, Coquitlam- 180,000sf, escalator installation, mall common space tile installation and electrical/data under-floor duct bank installation.
  • LCBO, The Beer Store, Canadian Tire Corporation, TD Bank, Scotiabank, CIBC, Toys R Us, SmartCentres- Multiple ground-up and interior fit-ups throughout Ontario for each retail entity.
  • RBJ Schlegel, Kitchener – Kitchen Facilities for this 600 Resident Retirement Complex.
  • Profine Molds, Oakville- 50,000sf design-build manufacturing facility.
  • ScotiaBank Corporate Premises, Toronto- Anti-terrorist budgeting and assessment and measures for Scotia Plaza post 9/11.
  • ScotiaBank Corporate Premises, Toronto- Security upgrades to Scotia Plaza cash handling area.
  • Toronto Maple Leafs Practice Facility, Toronto- 40,000sf training and player rehab facility.
  • Queen Richmond Center East, Toronto- 280,000sf “Robertson Chocolate” historical building complex restoration and base building retrofit.
  • Guelph Police Headquarters, Guelph- 15,000sf reception, change/shower facilities upgrade, and prisoner intake sally port.
  • Crescent School Sports Complex, Toronto- 35,000sf Fieldhouse and sports complex with change/shower facilities, weight room, indoor running track and four tennis courts.
  • Dalton Chemical, Vaughan- 5,000sf pharmaceutical manufacturing Level 1 clean rooms.
  • Maplehurst Correctional Complex, Milton- Design-build maximum security correctional facility.
  • Manulife Financial- South Tower Retrofit, Toronto- 12 story, 240,000sf base building retrofit and historical restoration followed by full “tenant” fit-up work.
  • Manulife Financial- Dawson Manor Estate, Newmarket- Relocation of historical building, site preparation and servicing.
LeClair Construction Management modern building construction

Contact Us

Email

darren@leclairconstructionmanagement.ca